Un petit séjour pour mon mari et sa mère

So last weekend saw hubby and grandma take a very short trip to France, with a view to meeting a plombier, a menuisier (joiner), and a plâtrier (plasterer). 

Le plombier spoke very good English and grandma wouldn’t let him go – had to show him Duolingo! He was called to sort out the leaking shower pipe that our former builder left us with, together with the hot water tank which doesn’t work properly (fitted by former builder too)

He replaced the pipe valve just in case – it hasn’t leaked at all! Much tighter fit now.  

Will quote re outside tap. Through kitchen units. Said he will drill in from the outside because the crèpi will break off if he drills from the inside. Re the drain – he said preferable to have one but with tiles it shouldn’t be a problem – just should’nt let the water lay on bare concrete as it soaks in. He will put an isolation tap in under the sink so we just turn it off when we’re not using it. 

Re shower – Hubby found receipt and plombier rang Bricorama for us and they have said take back the tap piece only and they will replace it. Receipt now clipped to the board in the kitchen and this must be our first job when we return in late July as 12 months is up on 4th August. They have none in stock at the moment but still sell them. Said they will be in stock by end of July. 

Le menuisier, Josh, has been in France 30 years. Covered area – the minimum height would be approx 2.2m. We could have the posts inset a little and would give more height. The crèpi needs doing first he thought – makes their job easier and less mess. He wouldn’t do the faux stone pillars – he would get Andy (the tiler) to do them and work together. They are filled with concrete and wire for strength. If we wanted wood he said they can be on studs which are very low to the ground but raised enough to stop water rising into the wood.

Shutters – again the crèpi needs to be on first – he needs to know the depth to have them fitting flush. He said the holes for hinges would not crack the crèpi. We want anodized metal hinges which match our existing shutter hinges – he said his supplier no longer offers anything but black. But he will buy the shutters from them and the fixings probably from Bâtiland as we know they have them. 

Stairs. He thinks he can sort (see pictures later) will cut a bit off the bottom and place at the top and then the bottom post would be adapted a little to fit flush. 
Balustrades – he can make some to fit – same colour but unlikely to be in beech! He will have them overlap the wood floor edge to hide the finish / edge of wooden floor.

Le plâtrier, manually plasters. Looks older when finished he says. More dimples than staccato. He doesn’t have a machine. He has to do one wall a day. Also can’t do it if over 30 degrees temp so July / August would be difficult. Paul explained the idea that we were trying to achieve the look of pigeoneer being older and the bungalow being the extension. He started suggesting one or more sides would look good in faux stone. Then the longer he was talking he started suggesting all in stone OR we would need to get a firm in to do the crepi with a machine. He is going to give us a price in a week or so for faux stone. He needs to chat with builders merchants. 

So all meetings were relatively positive. When things can begin is not so straight forward as it sounds like the crèpis must be done first. So another important job when we return is to find a professional crèpier. Answers on a postcard please😳

I received pictures of the garden, with many plants flourishing. Of course the grass needed cutting. 

And there was time for a bonfire 🔥 

Difficult to see, but the willows are growing. One day a willow arch. 


Our former builder (no longer employed) never fitted the stair rail and now we know why. Shoddy!!!

Let’s end positively with pictures of flourishing 🌱 


We’re looking forward to our summer in France now, with really just the finishing touches to the extension to organise. Our relationship with our former builder (Jeff Pittman) now over and even though he owes us money, we are moving on. Perhaps next year our extension will be finished but I’m not going to hold my breath. All in good time. Things do take longer in France. But hey ho!

Leaking shower

So as you may have already picked up from earlier posts, we have had a disappointing relationship with the builder of our extension in France. The contract for the work was signed in August 2014 and the work is yet to be completed. Our relationship with him has now completely broken down. Anyway I digress as this post is really about yet another issue that he has left us with. In this case a leaking shower and a shower that only supplies hot water. We highlighted this problem to him last year and several times since but nothing has ever been done about it. So this time when we turned on the water we awoke the next morning to a puddle. It’s not easy to get an emergency plumber in France. So we decided to having a go at solving the problem ourselves. 

First we sadly needed to saw through the perfect plasterboard on our landing. This then revealed the pipework for the newly fitted shower. The hot water feed turned out to be the offending pipe. So we turned off the water, armed ourselves with some cups and then unscrewed it. The cardboard washer   had all but disintergrated. Problem solved, or so we thought. We can hot foot it to the local Tridome and get a new one. Meanwhile, there was an almighty gush of water. Screams all round and buckets grabbed from downstairs. Towels thrown down. What the hell was that. It stopped but made another watery mess. New washers purchased from Tridome and fitted and we thought we’d solved the problem completely. Sadly not, so we’ve had to turn the water off. So annoying. We probably do need a plumber after all, unless anyone has any suggestions?

The other problem we’ve encounter associated with the thermostatic shower that we’ve purchased, is that the thermostat appears not to be working as it only emits bowling hot water. So no showers anyway. Any thoughts on what might be going on here?

Open garden, South West France😍

   image

First lunch at B’s.

image

Then to Loubens where one of B’s friends lives. She has a lovely Girondaise farm house that is on the market at moment.  House near Loubens

FullSizeRender

Super place to check out which plants will grow in this part of France and for garden design ideas. We will return to check it out at the start of the season. At the moment it is so dry and parched. Still looking good

image

I always think it’s lovely to stumble across a hidden oasis and treasures within a garden. Hydrangeas to die for and lots of hidden object d’art to stimulate the senses.image

IMG_2695

IMG_2693

IMG_2692

IMG_2684

IMG_2696

IMG_2715

To get all the details about open gardens in France go to:

http://rendezvousauxjardins.culturecommunication.gouv.fr/

image

 

Aaaarrrrgghhh, blasted wifi down AGAIN😡😡😡

image

OK, so I’m starting with grapes. Not sure why, just had a lot of time to take snap shots of the garden as we just couldn’t get a decent WiFi signal at the beginning of this week. Whaaaaaats up!  So now we’re back in Blighty I’m updating my blog.  This was the picture on our return to LBA early on Thursday morning.  What no sun!  We’d got so used to 30 degrees that 12 just didn’t cut it.

image

Anyway back to the building work.

You need the right tools!  This magnificent red contraption (a dry wall lifter) is a must when you are fixing plasterboard to the ceiling.  Hubby and I were chuckling, just imagining ourselves doing this job without the correct tools.  I know there would be lots of cursing and blaming each other!!!  Just as well our builder is putting the ceilings up.

image

This would have been hubby and me with the 4 x 4 propping up the board and one of us having a very achy arm/shoulder the next day.

imageUpstairs we now have a toilet and the shower tray has been installed.  We’ve also  purchased the shower, awaiting installation, and the sink/unit which has been installed temporarily, this we bought from IKEA last year.

We’ve now chosen the tiles for the en-suite, together with the wooden floor for the bedroom but because of the French holidays, we won’t be able to order these until September, so who knows when they’ll be fitted😦

Downstairs we’re going for a traditional French style tile and not sure of the pattern yet. Again this won’t be available until September. It would seem sensible then, to wait and decide on the covered area and patio tiles when these have been laid.

Watch this space👀

Rome ne s’est pas bâtie dans un jour

We’ve arrived to gorgeous weather.  It’s going to take us some time to acclimatise, although we have been having a bit of a heat wave back home in Blighty too.  It’s all hands on deck today with the building work as we have friends coming to stay for a week on Thursday.  We need to be sleeping in the new bedroom in the extension.  So it’s a case of the loo being fitted now, painting being done and then a temporary wash basin going in as well.

We’ve been madly mowing and strimming.  My son spent most of the first day we were here mowing the lawn as he was so board.  The minute we arrive he’s like, “what are we going to do” and we are like “we’ve just driven for 18 hours we want to snooze and do nothing”.  Bit of a miss-match going on.

All the plants that I put in at Easter have died and gone from this:

To this:

We will probably have to invest in some sort of watering system if we want to plant again or make sure we plant in October/November.  Although, the garden centres don’t have the same selection of plants at that time of year.

The exterior of the extension is now completed apart from the crépi.  The interior is still a work in progress.

IMG_2134

Paul is enjoying the new view from the bedroom window.

Now we need to choose flooring and tiles.  Allons-y!

La progression

 1st June and the windows are being put in.

 

17th June, work on the interior begins, starting with the loft area.

22nd June and the interior wall battens/studwork go in.

9th July, first fix electrics done and  now for insulation and plaster board.

We hope to see more progress when we arrive this Saturday:)